Notice of Construction

 What:  Work to replace the gravity sewer main located in the rear easements of the 700 Blocks of West Ilex Drive, West Jasmine Drive.

When:  Scheduled to begin on or about January 9, 2012.

Impact:  Trucks and equipment may be staged along West Ilex & West Jasmine Drive during normal working hours. Signs and flagmen will be used to control traffic as necessary.  Gasoline or diesel powered pumps and de-watering equipments may be operated around the clock for several days at a time.   

Should you have any questions please contact Steve Urich at SEACOAST:  (561) 627-2900.

PreviewAttachmentSize
Road construction.pdf32.25 KB

Newsletter Signup

Current weather

Lake Park

Overcast, light rain
  • Overcast, light rain
  • Temperature: 69.8 °F
  • Wind: Calm
  • Rel. Humidity: 100 %
  • Visibility: 10 mi
Reported on:
Thu, 05/17/2012 - 6:53am